This project consisted of 50 miles of new 345-kV line and 38 miles of 138-kV underbuilt on the same structures. Steel H-frame and steel single-pole structures were used on the project. Wire sizes were bundled 1590 ACSR on the 345-kV section and single 1192 ACSR on the 138-kV section.